Abstract
Abstract
Urban mega infrastructure projects are justified by long-term mobility, and environmental and social benefits, yet their construction imposes pressures that are concentrated in particular neighborhoods and periods and whose magnitude is rarely quantified at the assessment stage. This study examines the relationship between anticipated and documented construction-stage impacts in Section A of Athens Metro Line 4, from Alsos Veikou to Goudi, and extends the comparison to excavation-related material flows and to the conditions of social acceptance. A qualitative case-study design analyses the environmental permitting framework, the annual environmental reports of Elliniko Metro S.A. 2021–2025, the applicable waste legislation and the relevant literature, applying an analytical sequence that links predicted pressure, documented condition, management response, residual effect, resource-recovery pathway and social relevance. The documentation confirms that management mechanisms corresponding to the anticipated pressures were in place for noise, vibration, dust, traffic and public-space occupation, although it does not allow their effectiveness to be verified quantitatively. The clearest documented outcome concerns materials, since excavation products were directed to quarry restoration, fill and cover applications and cement production, while construction and demolition waste (C&DW) arising from archaeological works and utility relocations was transferred to licensed facilities. The findings indicate that separating excavation products from C&DW is necessary for an accurate reading of project circularity and that social acceptance can be addressed only conceptually in the absence of representative survey data. The framework offers a transferable basis for construction-stage follow-up of mega infrastructure projects and waste-management facilities.
Direct answer
What can I do from this paper page?
Use this page to scan "Predicted and Documented Construction-Stage Impacts of Urban Mega Infrastructure Projects: Environmental Follow-Up, Material Circularity and Social Acceptance in Athens Metro Line 4" quickly: start with the summary and abstract, then check the authors, source, topics, and related papers. From here, open Scollr to follow Environmental and Social Impact Assessments research, save the paper, or map adjacent work.
Research areas
Follow related topics
Citation
BibTeX
@article{Tsilikas2026Predicted,
title = {Predicted and Documented Construction-Stage Impacts of Urban Mega Infrastructure Projects: Environmental Follow-Up, Material Circularity and Social Acceptance in Athens Metro Line 4},
author = {Simos Tsilikas},
journal = {Sustainability Research in the Mediterranean},
year = {2026},
doi = {10.13052/srm2795-0514.018},
url = {https://doi.org/10.13052/srm2795-0514.018}
}
FAQ
Using this paper in a discovery workflow
How do I find related work for this paper?
Use the related papers and topic links on this page as starting points. In Scollr, you can also open the paper and build a literature map around its references, citing papers, and related work.
How can I keep up with new Environmental and Social Impact Assessments research papers?
Follow Environmental and Social Impact Assessments research in Scollr. New papers from the topic flow into a personalized feed, and you can save useful studies to revisit later.
Can I cite this paper from this page?
This page includes a static BibTeX block for Predicted and Documented Construction-Stage Impacts of Urban Mega Infrastructure Projects: Environmental Follow-Up, Material Circularity and Social Acceptance in Athens Metro Line 4. Always verify the DOI, source, and publication details against the publisher record before submitting a manuscript.
Follow this research in Scollr
Follow the topics and authors behind this paper, save useful studies, and build a literature map when you are ready to go deeper.
Get the app